U Chu Liang building is surrounded by good environment that respond well to a conducive working and social lifestyle.
These are the opportunities that U Chu Liang building is providing for those who possessed clear wide vision.
U Chu Liang building, a Grade A outstanding building with a high standard of safety coupled with leading technologiesin the building..
• Able to resists wind currents up to 160 kilometers per hour with curtain wall and special endurance glass.
• The structure of this building can withstand an earthquake of up to 6 Richter.
U Chu Liang building has installed rock wool together with fire barrier, they are installed between the gap of the curtain wall and the building, with adhesive installation, there is no gap between the floor-layers, therefore the air cannot pass through. Thus, in any case of fire, the smoke and fire cannot spread to the next floor faster than 2 hours.
If smoke or excessive heat is detected, the fire alarm will operate immediately with alarm and voice announcement that can be heard clearly throughout the building.
The fire exits are made from non-heat absorption materials. In any event of fire while passenger lifts are operating, the system will command the lifts to go straight to the lowest floor and the lifts will open for passengers to exit safely.
BAS will check the water volume in the water pipes for the fire sprinklers and release the water into the sprinkler pipes in order to extinguish fire at all times. There is a lift for firefighters that is completely separated from the passenger lifts that give access to firefighters for all floors. Fire can also be extinguished from the smoke protection room which is located next to the lift
200 %
For
The Aspiring
Achievers
Over a period of 20 years, U Chu Liang building has shown its potential in strength and endurance providing advantages, amenities, and security to our tenants with full efficiency. We also aim to be the leader of “Building for the Future” to serve our tenants intelligently by using the latest technology that can take everyone to new level of experiences beyond our normal lifestyles in working areas, with happiness and safety, creating the feeling of comfort and ease just like home.
The building is situated in one of the most prestigious areas in Bangkok,
right in the heart of the business district.
9.5 Rai Adjacent To Rama 4 Road
and outside the building
Meeting Room / Seminar
- The meeting and seminar rooms area able to accommodate 600 people.
- Complete facilities of audio and visual equipment, microphones and wireless system.
- Tea / Coffee corner
Fitness Center
A new clean and spacious fitness center with a clear view of Lumphini Park is available for all functions. After exercising there are adequate bathrooms to serve the needs of customers.
Car Park Building
Plenty of parking space available in our 9th floor car park building or at the 3 underground floors of parking.
Building Automation System (BAS)
With the efficiency and intelligence of Building Automation System (BAS), we are able to monitor activities and control through the central monitor in the building.
Communication System
Telephone lines from 4 networks are available for tenants Internet service with fiber optic technology from all networks is on every floor and can make be available with immediate effect.
Air-Conditioning System
Cool air flows thoroughly around the building with BAS that controls the temperature automatically.
Ventilation System
The ventilation system pulls in air from above Lumphini Park into the building through a big ventilator installed at the Floor 38, which is at the topmost of the building
Sanitary System
There are 16 passenger lifts available which are divided into 4 different zones. An average of 4 lifts per every 10 floors and there is an emergency generator in the event of electricity outage able to supply electricity to 2 passenger lifts in each zone.
CCTV
CCTV are installed covering all lift zones and the common area. The control room will store all the data, video and information recorded for a 1 month period.
Sanitary System
- The water tank has a capacity of up to 2,000 cubic
- The wastewater management is controlled by BAS according to the requirements of the government
Generator
Ready to cope with power loss at all times, there are 2 big generators that are able to generate up to 1,200 kva in size. The generators are able to supply electricity throughout the building and are tested every week.
Generator
At the topmost of the building is a legal landing and take-off for helicopters.
Shops and Services
Welcome to all lifestyles